The Niobrara Board of County Commissioners met in regular session on Tuesday, January 21, 2025, at 9:02 a.m. Those present were Chairman Patrick Wade, Vice-Chair Elaine Griffith, Commissioner Jeb Hanson, and County Clerk Becky L. Freeman. Members of the audience included Sheriff Randy Starkey and Kurt Gaukel.
Road & Bridge- Foreman Fred Thomas, Brian Wakefield, BenchMark of Torrington engineer, and Jim Whetsell of Whetsell Carpentry LLC, met with the Commissioners and discussed the 2024 Road Rehabilitation Project. The group discussed a letter BenchMark of Torrington provided to Mr. Whetsell, regarding the concrete headwall and a localized void which exists between the metal culvert wall and the concrete headwall. In the letter options were detailed on how to best repair the void to alleviate a future breakdown of the headwall. It was also noted that this void will be a maintenance issue for the County for the lifetime of this structure if a permanent solution is not achieved.
Unless the contractor chooses to pursue a more permanent method of correcting the problem, the following scenarios were offered:
1. A 15% overall cost reduction on the headwall project to make up for upkeep on the County’s part.
2. Provide the County with a 20-year warranty bond guaranteed through a surety in an amount equaling one-half of the total contract price.
Chairman Wade asked if a warranty bond or maintenance bond would pay to replace the project or cover repairs. Mr. Wakefield said that either bond option would cover repairs.
Mr. Whetsell contacted his insurance company to see if it was possible to purchase a 20-year warranty bond. Mr. Wakefield explained the situation to the insurance agent, noting that the defect in the concrete was the reason for the request for a 20-year warranty. The agent said there is nothing available like that and a 2-year warranty would possibly be available. It was noted that a maintenance bond would not satisfy what the County is trying to accomplish.
The group next discussed the cost of the headwall portion of the contract and Mr. Wakefield said it was $50,850.00. He said that 35% of the cost has been paid so far and there is still the 10% retention fee being withheld. Vice-Chair Griffith asked about vendors that have not been paid, and Mr. Whetsell provided the contractors’ names and amounts he owes them.
NIOBRARA COUNTY COMMISSIONERS
Patrick Wade, Chairman
Attest:
Becky L. Freeman, County Clerk